Welcoming TriMet’s New Orange Line and the Opening of Tilikum Bridge Crossing

H2Oregon was so excited for the opportunity to provide water as the “Water Station” for TriMet’s new Orange Line. The new Tilikum Bridge was packed with people riding the new line, walking, biking and running. The day was certainly a day to hydrate as temperatures topped to 94 degrees. We were pleased to be a vendor for their event. Lots of thirsty children, adults and some other four legged creatures!

children drinking water, trimet, orange line, happy girls, drinking, h2oregon, water h2oregon, portland, trijet, orange line, oregon, water water, portland, oregon, trijet, h2oregon, water, turtle, happy customer water, event, water station, trimet, orange line, bridge, water, h2oregon opening day, bridge, portland, oregon, h2oregon, drink water, hydrate, busy town, orange line cooling off with water, trimet, orange line, h2oregon, happy customer

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s